# How a 75-year-old electrical & low voltage contractor standardized preconstruction with AI

Kidwell encoded its estimating expertise into a single, repeatable process — turning preconstruction from individual craft into a team capability.

Download the case study Electrical & Low Voltage

70–80% Time saved reviewing plans and specs

1,395 Workflows run in 6 months

858 DoubleCheck reviews

145 Projects loaded on the platform

> “We estimate that we’re saving approximately 70–80% of the time typically spent reviewing plans and specifications. That’s on a per-estimator basis, so when you multiply that across the number of projects we bid each year, the total time savings is significant.”
>
> **Tim Jonas** Kidwell

Company Profile

| Company            | Kidwell, Inc.                                                                 |
| ------------------ | ----------------------------------------------------------------------------- |
| Industry           | Electrical Contracting & Low Voltage                                          |
| Company Size       | Large                                                                         |
| Headquarters       | Lincoln, NE                                                                   |
| Offices            | Omaha, Kearney, Des Moines, Sioux Falls                                       |
| Service Area       | Nebraska, Iowa, South Dakota                                                  |
| Teams using Pelles | Electrical & low-voltage estimating, project management, superintendents, VDC |

The Challenge

## Slow, manual, inconsistent — and impossible to scale

Every bid starts with hundreds of pages of project specifications that have to be read, interpreted, and translated into a clear scope for pricing and the field. For Kidwell’s estimating team, that work was a bottleneck — and it varied with whoever ran the bid.

- Spec review consumed days per bid. Estimators spent hours reading narrative spec language page by page, division by division, instead of pricing, scoping, and engineering.
- Output varied by who ran the bid. With no shared structure, two estimators reviewing the same specs could surface different details and miss different things — quality held together by individual expertise, not a repeatable process.
- Knowledge was tribal. What to look for on a healthcare project versus a K–12 project lived in the heads of the most experienced estimators. Onboarding a newer estimator meant months of side-by-side mentorship.

## Read the full case study

How Kidwell standardized spec review, submittal prep, and report generation — and what changed as a result.